ANYTHING FROM STREET BEAUTIFICATION TO CULVERT REPAIRS, WE COMPLETE ALL OUR PROJECTS WITH CARE, FOCUS AND DILIGENCE. AND WITH OVER 60 PROJECTS UNDER OUR BELT, WE ARE PROUD TO SHOW THE INCREDIBLE WORK OUR CREW WAS ABLE TO ACCOMPLISH OVER THE YEARS. OUR MISSION, FOR ALL PROJECTS; PAST, PRESENT, AND FUTURE, IS TO STRIVE FOR EXCELLENCE!

FEATURED PAST PROJECTS

Sweetwater Lane Community Park Trash Capture

Agency: County of San Diego

Completed: November 2021

Scope of Work: Consists in general of placement of a debris baffle box (DSBB), installation of 48” RCP storm drain, and construction of storm drain cleanouts. The project also included traffic control with temporary detour, trenching, shoring, connection to existing storm drain, saw-cutting and removal of existing pavement, and asphalt and concrete resurfacing.


Third Ave Streetscape Improvements - Phase III

Agency: City of Chula Vista

Completed: December 2020

Scope of Work: Consists of improvements within Third Avenue from E Street to approximately 200 feet north of F Street. The roadway was narrowed at intersections and at midblock crossings by extending curbs toward the centerline on each side of the roadway to provide one through lane in each direction between E Street and F Street. New raised medians were constructed, diagonal parking was provided, and pedestrians crossings were constructed with decorative pavers within the project limits.


Roosevelt Smart Growth Corridor

Agency: City of National City

Completed: December 2021

Scope of Work: Consists of constructing of streetscape improvements (sidewalk, curb and gutter, decorative concrete sidewalk), lighting, signage, mobility options, landscape and irrigation, and parking to the east side of Roosevelt Avenue, between 8th Street and National City Blvd.


Culvert Repair and Replace FY 2017-2018

Agency: County of San Diego

Completed: October 2021

Scope of Work: Consists of general culvert repair and replacement, including, installations of 18-42" RCP, modified headwalls, storm drain cleanout, AC paving, minor concrete (curb & gutter, cross gutter and concrete apron), traffic control, and clearing and grubbing.


Morning Sun Drive and Woodside Lane ADA Improvements

Agency: City of Encintas

Completed: January 2021

Scope of Work: Consists of clearing and grubbing, new concrete sidewalks, new pedestrian ramps, concrete driveways, concrete curb & gutter, storm drain pipes, installation of Class II Aggregate Base, asphalt concrete, installation of bioswales, vegetated swales, and traffic striping along Morning Sun Drive and Woodside Lane.


Projects Completed Throughout Tri-Group's 20 year History

Old Poway Park Museum Gas Line Replacement - City of Poway - Completed 2021

Segovia Way Pavement and Distress Repair - City of Carlsbad - Completed 2021

Sweetwater Lane Community Park Trash Capture - County of San Diego - Completed 2021

MacKinnon Ave ADA Sidewalk Improvements - City of Encinitas - Completed 2021

Culvert Repair and Replace FY 2017-2018 - County of San Diego - Completed 2021

CVEATC Pedestrian Bridge Repair - Phase 1 Temporary Guard House - City of Chula Vista - Completed 2021

Park Blvd - At Grade Linear Park Improvements - Civic San Diego - Completed 2021 (Landscape Maintenance to 2022)

Roosevelt Smart Growth Corridor - City of National City - Completed 2021

5 Concrete Sculpture Pedestals - City of Encinitas - Completed 2021

Dove Library Parking Lot Renovations - City of Carlsbad - Completed 2021

Sidewalk and Pavement Improvement at City Parks - City of Chula Vista - Complete 2020

FY 19-20 Corrugated Metal Pipe Annual Repair/Replace - City of Poway - Completed 2020

San Miguel Road and Oleander Ave Sidewalk Improvements - County of San Diego - Completed 2020

Pipeline Replacement 2019 - City of El Cajon - Completed 2020

Morning Sun Drive and Woodside Ave ADA Improvements - City of Encinitas - Completed 2021

Valle Verde Park Improvements - City of Carlsbad - Completed 2020

Carmel Valley Rd. Emergency Repairs - City of Del Mar - Completed 2020

SR-75 Median Improvements - City of Coronado - Completed 2020

El Toyon Park Irrigation Improvements - City of National City - Completed 2019

Third Ave Streetscape Improvements - Phase III - City of Chula Vista - Completed 2021

Santee City Hall Accessibility Upgrades - City of Santee - Completed 2019

Barrier at College and North River Rd. - City of Oceanside - Completed 2019

Poway Rd. Turn Pocket Extension - City of Poway - Completed 2019

Bike Lane Improvements on Broadway - City of Chula Vista - Completed 2021

Camino Del Mar Streetscape Improvements - City of Del Mar - Completed 2020

Mission Gorge Road Median Installation - City of Santee - Completed 2019

La Costa Storm Drain - City of Carlsbad - Completed 2018

Steele Canyon at Willow Glen Drive Intersection Improvements - County of San Diego - Completed 2018

18th Street Bicycle Enhancement Project - Phase II - City of National City - Completed 2018

ADA Pedestrian Curb Ramps & Sidewalks 2018 - City of El Cajon - Completed 2017

Palomar Street and Orange Avenue Sidewalk Improvements - City of Chula Vista - Completed 2017

Culvert Repair and Replace 2016-2017 - County of San Diego - Completed 2018

18th Street Bicycle Enhancement Project - Phase I - City of National City - Completed 2017

Maryland Elementary Mobility Improvements - City of Vista - Completed 2017

West Maple Canyon Mini Park - City of San Diego - Completed 2017

Alpine Boulevard Streetscape Improvements - County of San Diego - Completed 2016

Beta St. Green Alley - Civic San Diego - Completed 2016

Moss Street Sidewalk Installation - City of Chula Vista - Completed 2016

Mountain View Neighborhood Park Children's Play Area Upgrades - City of San Diego - Completed 2016

Potrero Elementary School Traffic Calming - County of San Diego - Completed 2016

El Cajon Median Improvements - City of El Cajon - Completed 2015

Cherokee Street Improvements - City of San Diego - Completed 2015

Culvert Repair and Replacement - County of San Diego - Completed 2015

Armorlite Drive Enhancements - City of San Marcos - Completed 2015

Palm Avenue Roadway Improvements - East of Beyer Way to Del Cardo Ave. - City of San Diego - Completed 2015

Park Boulevard and San Diego High School Pedestrian Traffic Signal and Streetscape Improvements - City of San Diego - Completed 2015

Relining & Rehabilitation of Drainage Facilities in Various Locations - County of San Diego - Completed 2015

Torrey Pines Road Improvements Phase 1 - City of San Diego - Completed 2015

De Luz Road Improvements - County of San Diego - Completed 2015

FY 13 Slurry Seal Group VII - City of San Diego - Completed 2014

Pomona, Seventh, Adella Intersection Improvements - City of Coronado - Completed 2014

Talbot Street Slope Restoration - City of San Diego - Completed 2014

Construction. Relining and Rehabilitation of Drainage Facilities in Various Locations - County of San Diego - Completed 2013

40th Street at National Ave and 40th Street at Alpha Street Pop-Outs - City of San Diego - Completed 2013

ADA Upgrades - California Dept. of Parks and Recreation - Completed 2013

Florence Griffith Joyner Elementary SR2S - City of San Diego - Completed 2013

FY 13 Slurry Seal Group VII - City of San Diego - Completed 2014

San Diego River Multi-Use San Diego River Pathway - City of San Diego - Completed 2013

...

AND EVEN MORE!

Tri-Group Construction & Development, Inc. - General Contractor

Office Hours: 8am–5pm, Monday through Friday

Office Address: 9580 Black Mountain Rd. Suite L, San Diego CA, 92126

Phone: (858) 689-0058

Email: info@trigroupinc.com

License No. 792159 Class A & B - PWCR DIR No. 1000004777