Wangenheim Neighborhood Park Joint Use Facility
City of San Diego
Start Date: February 2022
Scope of Work: Consists of demolition, grading, new grass fields, ball field, storm drain, water quality detention basin, snack bar/comfort station, sewer and water lateral and irrigation systems, shade sails to cover existing playground, retaining walls, parking lot, curb ramps, sidewalks, DG trail, sport lighting, fencing, backstops, and landscaping
Lindo Lake Photovoltaic Carports
County of San Diego
Start Date: November 2021
Scope of Work: Consists of the construction of two visually recessive and climb/vandal resistant, cantilevered steel carport structures with solar panels installed on the roofs of two carports. Hardscape and planting areas within the vicinity of the carports will be modified, repaired, and replaced per the construction documents. Landscape improvements include planting, decorative boulders and cobble, protection fencing, and an automated irrigation system.
Espola Road Safety Improvements - Phase II
City of Poway
Start Date: September 2021
Scope of Work: Consists of the construction of a DG pathway, grouted rock surface, asphalt berm and retaining walls from the existing sidewalk south of Mountain Rd. to the existing sidewalk to the south of Willow Ranch Road. It also includes asphalt paving and patching, curb ramps, driveways, utility relocations, landscape and irrigation, and signing and striping.
Tri-Group Construction & Development, Inc. - General Contractor
Office Hours: 8am–5pm, Monday through Friday
Office Address: 9580 Black Mountain Rd. Suite L, San Diego CA, 92126
Phone: (858) 689-0058
Email: info@trigroupinc.com
License No. 792159 Class A & B - PWCR DIR No. 1000004777